Kingfisher Oil Development Project
Rehabilitation works for Bugoma Jetty upgrade at Bugoma landing site and Design for upgrade of Masika airstrip.
Services: topographical and geo investigations, site investigations to assess existing conditions, design and production of detailed drawings and cost estimates
Client: CNOOC Uganda Ltd
Period: 2012
Well sites
Detailed design of well sites and access roads.
Activities include: Topographical surveys and Geotechnical investigations for both access roads and the well pads. Pad foundation design, cellar design for the well pads and;
Access road pavement design, Drainage design, Supervision of construction of access roads
Client: Tullow Uganda Operations (Pty) Ltd
Period: 2012
Ngiri 2 well pad.
Design and construction supervision of site preparations and spot repairing of access roads in preparation for well testing
Client: TOTAL E & P, Uganda
Period: 2012
Tangi Waste management area for oil exploration services
Design and supervision services for waste pit construction at Tangi yard. Services for the Excavation of waste fluid pits included lining of the pits, Concrete lining of the pits as well as Fabrication and installation of truss units to make pit covers
Client: Tullow Uganda Operations Ltd
Period: 2011
Framework contracts for roads and infrastructure in the districts of Hoima and Pakwach.
Supervision of roads and infrastructure in preparation for oil exploration activities
Client: Tullow Uganda Operations (Pty) Ltd
Period: 2011-2012