Kagga Projects

WATER SUPPLY

Mapping of Groundwater Resources in Uganda
Assessment, GIS Mapping, Data Management of groundwater resources for 44 districts in the country.
Client: Ministry of Finance, Planning and Economic Development, Uganda
Period: 2010-2012

Bushenyi Water Supply and Sanitation – Phase 1 & 2
Detailed engineering design and tender documentation for the Rehabilitation and Expansion of water and sanitation systems in Bushenyi for the next 20 years, implementation of on-site sanitation in the project area, tendering and supervision of construction of the required rehabilitation and expansion works
Client: National Water & Sewerage Corporation, Uganda
Period: 2007

Mukono – Seeta Water Supply System
Detailed design and construction supervision of the Transmission main line from Namanve to Mukono (8.9km), distribution main line from Namanve to Mukono (10.12km) running parallel to the transmission main line, basic distribution lines in Seeta and Mukono.
Client: National Water and Sewerage Corporation, Uganda
Period: 2006-2010

Water Supply and Sanitation for Masindi, Hoima and Mubende Towns
Design and supervision of works for the rehabilitation and expansion of existing water supply infrastructure in Hoima, Masindi and Mubende to increase the supply of portable water and improve the sanitation facilities in the three towns to meet projected demands.
Client: Ministry of Water, Lands and Environment/ Directorate of Water Development, Uganda
Period: 2002-2007

Uganda Rural Towns Water Supply and Sanitation Study
The study involved: Formulation of Strategic Development Plans, Feasibility Studies and Preparation of Detailed Designs and Tender Documents for the provision of water supply and sanitation services for each of the rural towns of Apac, Iganga, Kigumba, Mityana, Mpigi, Nebbi and Pakwach
Client: Ministry of Water, Lands and Environment, Directorate of Water Development, Uganda
Period: 2002-2004

Seven Gravity Flow Schemes in Mbale, Sironko and Kapchorwa District,
Design review, construction supervision and community mobilization services for the seven gravity flow schemes at Nambale, Busano and Buwagogo and Bufumbo in Mbale District, Buyobo in Sironko District, Nyalit and Chebenyiny in Kapchorwa District
Client: Directorate of Water Development/ RUWASA, Uganda
Period: 2001-2004

Rural Water Supply, Sanitation and Hygiene – Swaziland
Technical Assistance to enable the rural population of Swaziland to have access to portable water and effective sanitation systems and to strengthen the capacity of Government and NGOs to supply sustainably managed rural water and sanitation systems that meet the needs of the local
Client: Ministry Of Natural Resources And Energy – Swaziland
Period: 2001-2002

District Rural Water Supply and Sanitation Project
Feasibility studies for the rehabilitation and implementation of new community based water supply schemes in the Districts of Luwero and Masindi. The study identified the supplies as springs, shallow wells, valley tanks and boreholes.
Client: Ministry Of Energy, Water And Mineral Resources, Uganda
Period: 1992

Rehabilitation of the Kampala Water Supply
Review of Tender Documents to suit international bidding. Surveys and designs for 18km of 400- 600 mm pumping mains were also undertaken and Final Tender Documents prepared
Client: National Water and Sewerage Corporation, Uganda
Period: 1980

4 Districts Water, Hygiene and Sanitation Programme - Study, Uganda
Study of the 4 districts of Katakwi, Apac, Lira and Kumi to design a project to be implemented by DFID so as to contribute to poverty alleviation in Uganda through direct support to water, sanitation and hygiene improvement, consistent with national policy and other local programmes
Client: Directorate of Water Development/DFID
Period: 1999

SANITATION

Landfill sites at Libangeni and Mammetlhake
Engineering Service for Conceptualisation, Investigation, Design and Construction Supervision for the upgrading of Landfill sites at Libangeni and establishment of new landfill facility at Mathanjana area (Mammetlhake)
Client: Mpumalanga, South Africa
Period: 2012

Low Cost Bower Sewer Technology / Biogas Production Option in Kyotera and Bugembe towns
Preparation of detailed engineering surveys and validation of existing physical and topographical plans of the proposed project areas; Baseline socio-economic and development surveys, Detailed Engineering Designs, technical specifications, bills of quantities, design layout for tertiary and primary sewer layouts and cost estimates; Environmental scoping; Analysis of investment options and new tariff structures for various cost recovery scenarios and Preparation of Tender Documents.
Client: Ministry of Water and Environment, Uganda
Period: 2011

Ventilated Improved Pit Latrine (VIP) at Matshiding – Mpumulanga, Ga-makola and Nokaneng South Africa.
Socio economic surveys, topographical and hydro-geological surveys, detailed designs, tender documentation, evaluation and adjudication of tenders and supervision of 1151 ventilated pit latrines constructed at each stand in Matshiding project area and 758 in Ga-makola and 1959 in Nokaneng project area.
Client: Mpumalanga, South Africa
Period: 2008

Solid Waste Disposal Facility for Kampala District
Preliminary designs for a new waste disposal site.
Client: Kampala City Council, Uganda
Period: 2006