Kagga Projects

ROADS

Upgrading of Kabale – Kisoro - Bunagana / Kyanika Road (98.7km)
Design review & update, topographical & cadastral surveys, property valuation & compensation payment and construction supervision for upgrading of Kabale – Kisoro- Bunagana/Kyanika Road.
Client: Ministry of Works and Transport/RAFU, Uganda
Period: 2007-2012

Capacity Improvements – Kampala Northern Bypass.
Review of previous documents, ESIA study, Traffic studies, Axle load studies, Transport financial and economic evaluations, Hydrological studies, Soil and Materials Investigations and Land Acquisition processes
Client: UNRA, Uganda
Period: 2010

Upgrading of the Atiak – Moyo (88kms) Road
Design, tender assistance and construction supervision services comprising: bituminous surface dressed gravel road 6.0 m wide, with 1.0 m wide shoulders on both sides, 4 km of concrete pavement, the demolition and replacement of seven bridge decks, the construction of two ferry landings including reinforced concrete caissons, and associated drainage and erosion protection works.
Client: Ministry of Works & Transport
Period: 2007-2009

Upgrading roads to bituminous standards, Rukungiri – Kihihi – Kanungu/Ishasha (74kms), Kyenjojo – Hoima – Masindi - Kigumba (238kms)UNRA.
Feasibility study, detailed engineering designs and project management.
Engineering Investigations on the Mbarara – Kikagati Road.
Generation of technical information such as Traffic surveys, geotechnical information, road condition and inventory, topographical surveys for the 66km road to allow Contractors to Bid as a Design and Build Contract.
Client: UNRA, Uganda
Period: 2009

Kampala Urban Traffic Improvement Plans
Construction supervision services for up gradation of Lubiri Ring Road, Wankulukuku Road, Mutebi Road, KalindaRoad,Wansanso Road, and Muzito Road from a gravel road to a bituminous road standard;
Implementation of one-way systems, traffic improvements by introduction of street signs, zebra crossing points, reducing conflict points at junction points in Kampala.
Client: Ministry of Local Government, Uganda
Period: 2004

Upgrading to Paved (Bitumen) Standard of Gulu – Atiak– Nimule (140kms) Road.
To investigate and determine the technical, economical, environmental and social feasibility of upgrading the existing gravel road between the towns of Gulu in Uganda and Nimule to a paved all-weather bitumen standard road. Based on the results of the feasibility study, the consultant is to carry out detailed engineering designs, preparation of standard pre-qualification and bidding documents suitable for international competitive bidding and render assistance to the Client in the bidding process including the pre-qualification of bidders.
Client: MOWT/UNRA, Uganda
Period:2009-2011

Construction of a Bus and Taxi Route at Kameelriver A.
Upgrading and surfacing of approximately 2.35km of a bus and taxi route.
Activities: construction of new pavement layers, the construction of new storm water drainage, incorporating minor geometric improvements to both the vertical and horizontal alignment of certain portions of the existing road in order to ensure acceptable safety standards at the required design speeds.
Client: Dr. JS. Moroka Local Municipality, South Africa
Period: 2008-2009

Urgent Repairs on Kampala - Katuna Road: Section 1 Kampala (Kibuye) - Busega
Investigations and detailed design for remedial works on the most heavily trafficked 7.5 km section from Kampala City (Kibuye) to Busega. Services: Survey, hydrological studies preparations of contract drawings and documents
Client: MINISTRY OF WORKS, HOUSING AND COMMUNICATION, Uganda
Progress: 1997

BRIDGES

Emergency Repairs to the Nalubaale Bridge at Jinja, Uganda
Designs and supervision services for the ageing bridge in Jinja
Client: Ministry of Works & Transport, Uganda
Period: 2009

Nile Bridge Crossing at Jinja
Pre Investment study of the Nile Bridge involving the assessment of the available technical options for improvement/ replacement of the current Nile Bridge at Jinja and /or construction of a second crossing on the River Nile and to determine the financial implications of the alternatives. A study of all options available to the Government to finance the construction and maintenance of the available options, with consideration specifically required of the potential for partial or total financing from the private sector and the cost recovery via tolling, by any other means.
Client: Ministry of Works, Housing and Communications/RAFU
Period: 2005

New Jinja Bridge in Uganda
Carry out an assessment of the feasibility of constructing a New Bridge in Uganda.
Client: Uganda National Roads Authority
Period: 2008-2009

RAILWAY

Culvert Repair on Jinja – Busembatya Railway line
Supervision services for repair and installation of 9 ARMCO culverts (size) on the Jinja – Busembatia section.
Client: Rift Valley Railways
Period: May 2012

Replacement of the ARMCO Pipe Culverts at Mileages 323/0
Design review, tendering process and supervision services for the repair of the failed culvert along the Jinja – Malaba railway section
Client: Rift Valley Railways
Period: 2008

Inland Container Terminal (ICD) at Kampala in Uganda
Design review and tendering process
Client: Ministry of Finance, Planning and Economic Development/URC.

Replacement of the Armco Pipe Culverts on the Jinja Railway Section
Detailed design and tender documentation for the replacement of 9no. Locations of corrugated Armco pipe culverts on the Jinja Busembatia railway line section (67km) due to their advanced state of dilapidation.
Client: Ministry of Finance, Planning and Economic Development/URC
Period: 2007

Urgent Repairs to Kampala-Malaba Railway Line
Design review and preparation of Tender documents for the supply of essential maintenance equipment, track rehabilitation and associated works, the replacement of the Naigombwa culverts with bridge, strengthening of Iganga culverts with head walls and wing walls, refurbishment of the Nile bridge (bearings and some painting) and the provision of inspection and supervision services for single track line 156 miles (250kms) longKampala - Malaba Railway Line.
Client: Uganda Railways Corporation
Period: 2000